Brightstar, GRES to build Laverton gold plant

PROCESSING

Project to build 1.5Mtpa gold plant still awaiting FID and contract execution

A schematic of the 1.5Mtpa processing plant design overlaid on the existing site layout.

A schematic of the 1.5Mtpa processing plant design overlaid on the existing site layout. | Credits: Brightstar Resources

Brightstar Resources has chosen GR Engineering Services as its preferred contractor to build a 1.5 million tonne per annum gold process plant 35km southeast of Laverton, Western Australia. The plant…

Get the Mining Monthly Newsletter delivered free each day

Expert-led Insights reports built on robust data, rigorous analysis and expert commentary covering mining Exploration, Future Fleets, Automation and Digitalisation, and ESG.

Expert-led Insights reports built on robust data, rigorous analysis and expert commentary covering mining Exploration, Future Fleets, Automation and Digitalisation, and ESG.

editions

Future Fleets Insights 2026

Mining IQ Insights delivers annual standalone reports that expand upon the most relevant discussion points in the mining sector.

editions

editions

editions

Mining IQ Exploration Insights 2025

Gain exclusive insights into the world of exploration in a comprehensive review of the top trending technologies, intercepts, discoveries and more.